Ask Skyline
Specs, drawings, lead times, test reports.
Tell us the building and the constraint. A Skyline engineer answers, usually the same business day.
- Who answers
- Skyline sales and engineering, in-house.
- Typical turnaround
- Same business day.
- Manufacturer of record
- Skyline builds the system it specifies, so the spec, the lead time and the warranty come from one source.
- Self-serve instead
- Resource Center for three-part specs, CAD and BIM.
How Skyline works
New York projects. Skyline manufactures the system and installs it.
Everywhere else. Skyline supplies the system and the drawings; your glazing contractor installs.
Before you write
Three things that get you a real answer faster.
01
The address
It tells us the exposure, the wind load, and whether the Landmarks Preservation Commission is involved.
02
What is failing
Air infiltration, operation, acoustics, water. The failure mode selects the system.
03
The date
Approval date, hoist date or lease-up. Lead time is a real constraint and we would rather say so up front.